$16.00

(answered) – 1. 20-Station Assembly Line Consider an assembly line with 20DescriptionSolution downloadThe Question1. ?20-Station Assembly LineConsider an assembly line with 20 stations. Each station has a 0.5% probability of making a defect. At the end of the line, an inspection step singles out the defective units. The inspection step catches 80% of all defects. From inspection, units that are deemed to be non-defective are moved to the shipping department.If a defect is found at inspection, it is sent to the rework department. Rework fixes about 95% of the defective units. Units are directly shipped from the rework department with no further inspection taking place.What is the probability that a unit ends up in rework (in decimal form)?2. ? ?20-Station Assembly LineConsider an assembly line with 20 stations. Each station has a 0.5% probability of making a defect. At the end of the line, an inspection step singles out the defective units. The inspection step catches 80% of all defects. From inspection, units that are deemed to be non-defective are moved to the shipping department.If a defect is found at inspection, it is sent to the rework department. Rework fixes about 95% of the defective units. Units are directly shipped from the rework department with no further inspection taking place.What is the probability that a defective unit is shipped (in decimal form)?3. ? ??3-Step Process with ReworkConsider the following three-step assembly operation with quality problems. All resources are staffed by one employee.The first resource has a processing time of 7 minutes per unit.The second resource has a processing time of 6 minutes per unit.The third resource has a processing time of 5 minutes per unit. With a 40% probability, the flow unit coming out of the third resource has to be reworked. In that case, the operations at the second and third resources are repeated. You can assume that (a) rework always succeeds (i.e. a unit going through the rework loop will always work after the third resource),and (b) the processing times for units in rework are the same as for regular units.For every unit of demand, how many units have to flow through the second step in the process?4. ?Where in the process is the bottleneck?Solution detailsSolution #0002300610(answered) – 1. 20-Station Assembly Line Consider an assembly line with 20.zipUploaded by: TutorAnswer rating: ★★★★★This paper was answered on 27-Aug-2016Price: $21About this QuestionSTATUSAnsweredQUALITYApprovedDATE ANSWEREDAug 27, 2016EXPERTTutorANSWER RATINGNOTE: USING THIS SERVICE IS LEGALUsing this service is LEGAL and IS NOT prohibited by any university/college policies. We have top-notch tutors who can do your essay/homework for you at a reasonable cost and then you can simply use that essay as a template to build your own arguments.You can also use these solutions:As a reference for in-depth understanding of the subject.As a source of ideas / reasoning for your own research (if properly referenced)For editing and paraphrasing (check your institution’s definition of plagiarism and recommended paraphrase).This we believe is a better way of understanding a problem and makes use of the efficiency of time of the student.NEW ASSIGNMENT HELP?Order New Solution. Quick TurnaroundClick on the button below in order to Order for a New, Original and High-Quality Essay Solutions. New orders are original solutions and precise to your writing instruction requirements. Place a New Order using the button below.$(document).ready(function(e) { //$(document).prop(‘title’, ‘(answered) – 1. 20-Station Assembly Line Consider an assembly line with 20’); });Disclaimer : Studiesgma.com does not claim copyright on questions and answers posted on the site. Uploading copyrighted material is not allowed. Th

(answered) – 1. 20-Station Assembly Line Consider an assembly line with 20

Reviews

There are no reviews yet.

Be the first to review “(answered) – 1. 20-Station Assembly Line Consider an assembly line with 20”

Your email address will not be published. Required fields are marked *